The expected yearly production of the plant is around 863,000 kWh by saving around 371 tonnes of CO2 emissions per year. The customer is utilizing approximately 75% of the generated electricity.

The payback time at roughly four years is very attractive.

PV roof-top installation
770 kWp of installed capacity
4 years payback time

local case study

Italia

Logistics Centre

The expected yearly production of the plant is around 863,000 kWh by saving around 371 tonnes of CO2 emissions per year. The customer is utilizing approximately 75% of the generated electricity.

The payback time at roughly four years is very attractive.

PV roof-top installation
770 kWp of installed capacity
4 years payback time

Project Location

The construction period happened in a very short time, despite the challenges posed by external factors such as the Corona crisis. Nevertheless, the entire project was realized within two months. In order to minimize any downtime that could have lead to an impairment of the customer’s ongoing operations, the team had to lift the necessary PV components by using a helicopter. These activities were carried out efficiently in only two hours.

For more information about what we offer in Italy please click here. We also offer holistic energy solutions for you and your company on a global level. Find out more about our Global Energy Solutions and Case Studies.  

Project TypePV roof-top installation
LocationArcole, Verona
Commissioned2021
Installed capacity770 kWp
Reduction of carbon emissions371 tonnes/year
Reduction of corporate energy costs75 percent/year
Payback time4 years