ItalyThe expected yearly production of the plant is around 863,000 kWh by saving around 371 tonnes of CO2 emissions per year. The customer is utilizing approximately 75% of the generated electricity.
The payback time at roughly four years is very attractive.
The construction period happened in a very short time, despite the challenges posed by external factors such as the Corona crisis. Nevertheless, the entire project was realized within two months. In order to minimize any downtime that could have lead to an impairment of the customer’s ongoing operations, the team had to lift the necessary PV components by using a helicopter. These activities were carried out efficiently in only two hours.
For more information about what we offer in Italy please click here. We also offer holistic energy solutions for you and your company on a global level. Find out more about our Global Energy Solutions and Case Studies.
Project Type | PV roof-top installation |
---|---|
Location | Arcole, Verona |
Commissioned | 2021 |
Installed capacity | 770 kWp |
Reduction of carbon emissions | 371 tonnes/year |
Reduction of corporate energy costs | 75 percent/year |