local case study
ItalyIn total, an area of over 4,200 square metres is covered by the photovoltaic modules. This allows an installed capacity of 846 kWp, which guarantees the system a high level of self-consumption.
Consequently, a total of 980,000 kWh/year of green energy will be produced, which will avoid the production of around 580 tonnes of CO2. During the construction activities, BayWa r.e. had to manage and solve several critical operational issues, mainly related to logistical aspects such as the height of the buildings or the presence of the canopy along the perimeter.
A large focus had to be set with regards to avoiding downtimes for the centre’s operations., as well as the need to cause as little disruption as possible to the activities of the production centre.
These critical factors led to the use application of large crane trucks and the decision to install the tower only when staff was off. on public holidays.
Despite these challenges, the project was completed in a remarkably recordshort time, with the installation of the system taking just 70 days.
For more information about what we offer in Italy please click here. We also offer holistic energy solutions for you and your company on a global level. Find out more about our Global Energy Solutions and Case Studies.
Project Type | PV roof-top installation |
---|---|
Location | Rubiera, Reggio Emilia |
Commissioned | 2021 |
Installed capacity | 846 kWp |
Reduction of carbon emissions | 590 tonnes/year |